The area of Euston/ Robinvale is a diverse irrigation; horticulture, cropping area, leading into efficient mallee cropping land and large stock runs.
Optimum Constructed two sealed silos in 2004, followed by four in 2007, and six in 2021. This is a great example of working with farmers over multiple generations in their business and ours.
Its always a pleasure dealing with Luke. And the job looks fantastic with two rows showcasing our product over time.