Our PROJECTS
Walgett NSW
Staged over 2024 and 2025. Designed for further expansion. A model for the full system was produced, and a silo lay out determined to suit
Lockhart NSW
Two 1182 SilOz Grain Silos tonne Optimum 273mm unloading auger Three phase electric unloading and sweep 120t/hr Sweep auger with unique walking mechanism Heavy design
Walgett NSW
Staged over 2016, 2023/ 24 and 2026. Designed for further expansion. A model for the full system was produced, and a silo lay out determined
Burtundy Station, NSW
At Optimum Silos, we understand that every primary producers’ needs are different, and every property will require something a little different to achieve its goals.
Grain Corp – Boree Creek NSW
Boree Creek Grain Corp site was constructed from scratch in 1999. There are 8 x 3000t Cyclone silos, rail outloading, road in and outloading x
Mungo
150km Nth of Balranald NSW. This project consists of two 4233 cyclone silos. Optimum Unloaders 120t/hr run off PTO and Hydraulics. Including the walking sweep