150km Nth of Balranald NSW.
This project consists of two 4233 cyclone silos.
Optimum Unloaders 120t/hr run off PTO and Hydraulics. Including the walking sweep for improved safety.
The project being 150km from the small town of Balranald required detailed planning, the land line phone was not operational while the job was conducted so communication was done by satellite email.